This project consists of construction of a new office building on an existing campus which currently has 2 buildings and parking lot surfaces on the site. The project consists of a 10,329 sq. ft one story building. The building is a steel frame structure with masonry and metal panel veneer over metal stud framing.
Owner: Global Shop Solutions
Location: The Woodlands, Tx
Architect: Ziegler Cooper Architects, inc.
Cost: $3,587,646
Project Team:
Lynn Foster-Project Manager
Danny Mcglothern-Superintendent
David Jones-Superintendent